Archetype

You wanted fan options?

Core Installation

BOM


Heatsets

Prepare your left and right carriage blocks by first placing the heatsets as illustrated below.

Hardware

  • 6x M3x5x4 Heatset Inserts

Video Guide

Step by Step


Attaching to the Rail

Hardware

  • 4x M3x6 SHCS
  • x2 M3x16 FHCS
  • x2 M5 Washer

Video Guide

Step By Step

Position the carriage blocks over the holes on the rail carriage.

Place blocks on the carriage and align the holes.

Insert the 4 M3x6 SHCS through the cores into the carriage.

Optional Rigid Mounts

Insert 2 M3x16 FHCS with M5 washers on the back to stabilize to the carriage.


Belt Clips

Hardware

  • 2x Belt tubes
  • 2x M3x45 Belt pins of choice (pin or screw) (shown in pictures is an allen key, not required)

Video Guide

Soon™

Step by Step

Your belts should be routed through your gantry at this point, now we're going to install the belt clips.

  • Pull your belt through the belt clips.
  • Make a loop and pinch together so that the teeth are locking together.
  • Pull the belt back through the same hole in the clip.
  • Leave enough slack in the previous step, and slide the 4mm OD tubes through the opening of the loop and through the centre of the clip.